Winter
        Concrete.

Old or failed caulking is removed and replaced with high-performance, exterior-rated sealant. We prep surfaces, tool clean joints, and seal for long-term weather protection.

Date

03.12.2025

What

Driveway and Curbs

Duration

2 Weeks

Concrete Driveway & Curbs In Winter

We poured and finished a concrete driveway and curbs during winter conditions using proper cold-weather procedures — controlled temperatures, protected curing, and tight finishing tolerances — to deliver a durable surface that won’t scale, crack, or fail when the freeze-thaw cycles hit.

Unbreakable crew. First time right.